Bethany Reformed Church Sheboygan, Wisconsin


Description

A Master Plan was first developed to determine how the Worship , Fellowship, & Educational needs could be met over the next 20 years. Phase 1 of the Master Plan included a new Family Center for dinners, youth activities & contempory worship services.

The new addition enlarged the former small and dark Narthex and features a 8’x8’ skylight in the axis of buildings circulation corridors. The former Fellowship Hall was converted to educational spaces.

Program
Built: 1999
Building Cost: $925,000
Estimated Cost: $948,000


Services provided
Master planning
Schematic design
Construction Documents
Construction Administration

Liturgical Furnishings Consultant
Conrad Schmit Studios
Gunder Co.

Consultants
Structural Ambrose Engineering
Plumbing Holland & Kurtz
HVAC Bert Fredericksen, Inc.
Electrical Muermann Engineering
Acoustical Scott Riedel

This project was designed by Groth and Smies Architects Ltd. under the direction of Jeff Smies while he was President of Groth and Smies Architects Ltd. from 1994 through 2002