Highview Evagelical Presbyterian Church Genesee, WI


Description
The project consisted of a new church building set in the southern Kettle Moraine region of Wisconsin. The new rural, wood framed church, was designed to be built in two phases. Phase I, built in 1997, is the first floor gathering, fellowship hall, church office, toilet and nursery. The Fellowship Hall will be used as the worship center for five to eight years until Phase II gets built. The materials used on the exterior include natural field stone & cedar siding to reflect the natural “Kettle Moraine” terrain of the area
Phase II (approximately $1.6 million) will be the new worship space, gathering area, library, and cry room. The new Sanctuary will have: a vaulted drywall ceiling, tiled and carpeted floors, wood chancel floor, and field stone reredos wall. There will be a partial basement under the north end of the building to house the mechanical systems and additional storage space for the new facility. Once the new worship space gets Finished the old fellowship hall, that was being used as the worship center Will be converted to Classroom, Activity and fellowship use only.

Program/Phase 1
Built: 1997
Building Cost: $510,000
Building Area: 5,690 sq. ft.
Program/Phase 2
Proposed: 2007
Est. Building Cost: $1.6 million
Proposed Building Area: 10,077 sq. ft.
Services provided
Master planning
Schematic design
Construction Documents
Construction Administration
Consultants
Structural efJ Consulting
Plumbing Holland & Kurtz
HVAC Frederickson Eng.
Electrical Muermann Engineering
Acoustical Riedel & Associate