Holy Angels Catholic Church West Bend, Wisconsin
Description
The four additions renovated all existing entrances on 4 corners
of the existing church. Each entrance now has covered doors &
handicapped accessible stairs. The largest covered car drop-off
also includes as elevator to the worship center & to the newly
renovated basement Fellowship Hall. The basement renovation also
includes a new serving kitchen, a mission & sewing room, a working
sacristy, a brides room & two new H.C. restrooms.
The renovated worship center created two side seating/overflow
areas off the now accessible sanctuary/chancel. New computer programmable
heating and cooling was also added to the entire facility without
visible effect to the original worship area.
Program
Built: 2002
Building Cost: $1,850,000
Estimated Cost: $1,787,000
Services provided
Master planning
Schematic design
Construction Documents
Construction Administration
Consultants
Structural Ambrose Engineering
Plumbing Holland & Kurtz
HVAC Fredericksen Engineering
Electrical Czarnecki Engineering |