Back To Religous
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
Holy Angles
 
     
     

Holy Angels Catholic Church West Bend, Wisconsin

Description
The four additions renovated all existing entrances on 4 corners of the existing church. Each entrance now has covered doors & handicapped accessible stairs. The largest covered car drop-off also includes as elevator to the worship center & to the newly renovated basement Fellowship Hall. The basement renovation also includes a new serving kitchen, a mission & sewing room, a working sacristy, a brides room & two new H.C. restrooms.

The renovated worship center created two side seating/overflow areas off the now accessible sanctuary/chancel. New computer programmable heating and cooling was also added to the entire facility without visible effect to the original worship area.

Program
Built: 2002
Building Cost: $1,850,000
Estimated Cost: $1,787,000


Services provided
Master planning
Schematic design
Construction Documents
Construction Administration

Consultants
Structural Ambrose Engineering
Plumbing Holland & Kurtz
HVAC Fredericksen Engineering
Electrical Czarnecki Engineering

This project was designed by Groth and Smies Architects Ltd. under the direction of Jeff Smies while he was President of Groth and Smies Architects Ltd. from 1994 through 2002