First Reformed Church Cedar Grove, Wisconsin
Description
The 19,000 sq.ft. addition features a new first floor Fellowship
Hall & Worship Overflow with cathedral ceiling. The interior
of the Fellowship Hall will also feature wood trusses to reflect
the 1900’s Sanctuary. A new kitchen, library, and bathrooms
are also included on the first floor.
The lower level will include Youth/Activity rooms, classrooms
for educational needs, new H.C. restrooms & ancillary support.
The addition increases the churches ability to hold and serve large
multi-purpose gatherings. Issues of accessibility throughout entire
facility were resolved with the addition of interior stairs, ramps,
and an elevator.
Program
Construction Slated to begin 2002
Estimated Cost: $3 — 3.5 milllion
Building Area: Addition 19,000 sq.ft.
Renovation 3,700 sq.ft.
Services provided
Master planning
Schematic design
3D– Modeling
Construction Documents
Construction Administration
Consultants
Structural Ambrose Engineering
Plumbing Holland & Kurtz
HVAC Bert Fredericksen, Inc.
Electrical Muermann Engineering
Food Service Kanning & Associates
|