Religious
First Reformed
East Elevation Sanctuary
Exterior
Church from SE
Exterior
First Reformed
Exterior
First Floor
First Reformed
First Reformed
intertor
First Reformed
ntertor
Outside
Outside
First Reformed
First Reformed
First Reformed

First Reformed Church Cedar Grove, Wisconsin


Description
The 19,000 sq.ft. addition features a new first floor Fellowship Hall & Worship Overflow with cathedral ceiling. The interior of the Fellowship Hall will also feature wood trusses to reflect the 1900’s Sanctuary. A new kitchen, library, and bathrooms are also included on the first floor.

The lower level will include Youth/Activity rooms, classrooms for educational needs, new H.C. restrooms & ancillary support.

The addition increases the churches ability to hold and serve large multi-purpose gatherings. Issues of accessibility throughout entire facility were resolved with the addition of interior stairs, ramps, and an elevator.
Program
Construction Slated to begin 2002
Estimated Cost: $3 — 3.5 milllion
Building Area: Addition 19,000 sq.ft.
Renovation 3,700 sq.ft.


Services provided
Master planning
Schematic design
3D– Modeling
Construction Documents
Construction Administration

Consultants
Structural Ambrose Engineering
Plumbing Holland & Kurtz
HVAC Bert Fredericksen, Inc.
Electrical Muermann Engineering
Food Service Kanning & Associates