Greenbush Town Hall / Fire Station Greenbush, Wisconsin
Description
The new facility was built to replace the existing town hall and
2-bay fire station. Separating the Fire Department from the Town
Hall was important to the planning committee. Each wing has bathrooms
and a meeting area. Colored “spit-faced” block and vinyl
siding were used along with shingles and clad windows kept the initial
cost down and future maintenance costs low.
Program
Built: 1999
Building Cost: $875,000
Services provided
Master planning
Schematic design
Construction Documents
Construction Administration
Consultants
Structural Ambrose Engineering
Plumbing Holland and Kurtz
HVAC Fredericksen Engineering
Electrical Muermann Engineering
|